Scope & Vertical Slice Definition

Scope & Vertical Slice Definition

scope-and-slice 90 min
Standards (3)
  • 16.9 Logistics & Resource Planning
    Identify specific production or project needs and logistics (e.g., timeline, location/venue, casting, funding, insurance, permits, equipment, blueprints or schematics, scheduling, and crewing/staffing); adhere to all workplace safety standards and protocols for performance venues or locations.
  • GD.18.3 Concept Pitch & Iteration
    Develop and pitch high-level game concepts, incorporating player demographics, gameplay loops, narrative arcs, and thematic pillars; iterate concepts based on feedback.
  • 5.8 Systems Thinking
    Apply systems thinking to analyze complex problems, identify recurring issues and their causes, and generate solutions to inform decision-making.

The task

As a studio, lock the scope of the slice you’re building this year. Sort every feature from your greenlit pitch and your early GDD draft into Must, Should, Could, or Won’t, and produce one scope contract document the whole team signs and holds itself to.

This is the document you will point back to in March when someone wants to add one more mechanic.

Deliverable: Team-signed Vertical Slice Scope Contract (shared doc) + individual portfolio reflection entry.

Before you start

Read Scope and the Vertical Slice (PROD-204).


Steps

Step 1 — List every feature anyone has proposed

Pull every mechanic, asset, system, and level requirement from your greenlit pitch, your GDD draft, and any group brainstorming sessions. Get them all written into a single shared raw list before sorting anything.

Note

Do not pre-filter at this stage. Even unrealistic or ambitious ideas belong on the initial raw list so they can be formally evaluated and officially classified into the contract.

Step 2 — Sort into MoSCoW, as a group

As a team, review every item and assign it to one of the four MoSCoW buckets:

  • Must have: If even one of these features is missing, the vertical slice fails to demonstrate the core game loop.
  • Should have: Genuinely valuable and planned for inclusion, but the core slice remains playable without it.
  • Could have: Low-cost polish items and stretch goals. The first items cut when deadlines tighten.
  • Won’t have: Explicitly cut or deferred for this vertical slice.

If team members disagree on whether an item is a Must or a Should, talk it out. That debate is valuable: it exposes differing assumptions about the core loop before production begins.

Step 3 — Stress-test the Must-have list

Once sorted, read your Must-have list out loud as a single continuous sentence describing what a player experiences in the slice:

“The player controls [Character] in [Location], uses [Core Mechanic] to solve/defeat [Primary Challenge], and completes the slice at [End Trigger].”

Ask honestly: Is this genuinely buildable by this team in our available lab hours before deadline? If you are unsure, move the least critical item from Must down to Should. A lean Must-have list now is what makes spring milestones achievable.

Step 4 — Write the Won’t-have list clearly

The Won’t-have section is the most important part of your contract. Do not treat it as a graveyard of discarded bullet points. Write each cut feature as a clear sentence explaining why it is omitted:

  • Example: "Multiplayer / Co-op — Out of scope for a 5-minute single-player vertical slice; revisit only in post-slice full production."
  • Example: "Branching Narrative Dialogue Trees — Requires custom UI and narrative scripting beyond current timeline; slice will feature direct environmental objectives instead."

Step 5 — Define the slice boundary

Write a single, tightly scoped paragraph defining the start, middle, and end conditions of the slice:

  • Where does the player start? (e.g., waking up in the broken maintenance bay).
  • What is the central objective? (e.g., restore power to the primary airlock).
  • Where does the slice end? (e.g., stepping through the airlock as the station alarms trigger).

This boundary paragraph is the studio’s concrete definition of “Done” for the year.

Step 6 — Build the scope contract document

Format your studio’s scope contract into a clean document (Google Doc or Notion page) containing:

  1. Title & Game Hook: Game title, logline, and studio team name.
  2. Slice Boundary Paragraph: The narrative and gameplay start/end conditions.
  3. MoSCoW Feature Tables:
    • Must-have features
    • Should-have features
    • Could-have features
    • Won’t-have features (with rationale for each)
  4. Team Signatures: Date and typed/signed names of every studio member committing to this scope.

Step 7 — Post it where the team works

Link the signed scope contract at the top of your team’s GDD and pin it to your Kanban task board (Trello/GitHub Projects). Whenever a new idea or mechanic is proposed during sprints, check the contract first.


Submit

Google Classroom & Portfolio Submission:

  1. Team Link: One team member posts the direct link to the published Scope Contract document in Google Classroom.
  2. Individual Reflection: Each student posts a short reflection entry to their Google Sites portfolio Coursework page under the GAD2 U1 section:
    • One feature you argued to keep in Must-have, and your reasoning.
    • One feature you agreed to move to Won’t-have, and how cutting it protects the team’s schedule.

Rubric

Assessment Rubric

CriteriaProficient (4-5 pts)Developing (2-3 pts)Beginning (0-1 pt)
MoSCoW Prioritization RigorClean, realistic separation of Must, Should, Could, and Won’t; Must-have list is tightly scoped to a 5–10 minute playable core loop achievable within lab constraints.Must-have list is slightly bloated or contains features that should be classified as Should/Could.Features are arbitrarily listed without clear criteria; unrealistic scope for available time.
Won’t-Have RationaleAll deferred/cut features are explicitly documented with professional rationale explaining why they are out of scope for this slice.Won’t-have section is present but lacks clear justification or consists of one-word bullet points.Missing Won’t-have section or features quietly discarded without team consensus.
Slice Boundary DefinitionSlice start, middle gameplay loop, and end trigger are unambiguously defined in a clear narrative/gameplay boundary paragraph.Slice boundary is somewhat vague (e.g., clear start but ambiguous victory/completion state).Missing boundary paragraph; no clear definition of what “done” means for the slice.
Contract Alignment & Sign-offDocument is fully signed by all studio members, dated, linked from the team task board/GDD, and formatted cleanly.Document is missing 1 or 2 signatures or is not linked in team workspace.Incomplete document or unshared draft.
Individual ReflectionPortfolio entry demonstrates critical thinking, clearly explaining one defended Must-have and one embraced Won’t-have trade-off.Reflection is brief or only discusses one feature without clear rationale.Missing portfolio reflection entry.

Notes

  • This document is a contract with your future selves, not with me. Its entire value is in what it stops the team from doing in February: relitigating a decision that was already made in September.
  • Revisit it, don’t rewrite it. At each milestone review, check whether the build still matches the scope contract. If something has genuinely changed, update it deliberately as a group, the same way you did here. Don’t let it drift quietly.
  • Won’t have is not permanent for the studio, only for this slice. An idea in Won’t have this year might be exactly the right pitch for someone’s next project. Cutting it now doesn’t waste it; it ensures the project ships.